Lom Pangar Dam Fact SheetMay 1, 2005 By Global Village Cameroon and International Rivers The government of Cameroon is currently considering building the Lom Pangar Dam, a project that would displace rural villagers, flood protected forests, and increase the vulnerability of Cameroon’s economy to climate change. Increased hydropower generation downstream of Lom Pangar would mostly go to a large, foreign–owned aluminum smelter, which is expected to continue receiving below–cost electricity rates subsidized by residential ratepayers. The dam has been discussed for over a decade, but with a growing national energy crisis, the Cameroonian government has recently intensified efforts to obtain financing for the project. 1. The Wrong Solution for a Warming World Lom Pangar would be the fourth dam1 built to help regulate the Sanaga River for the benefit of the country’s two primary hydropower dams, Song Loulou (384 MW) and Edea (264 MW). These run–of–river hydropower dams have experienced significant reductions in power generation due to dry seasons exacerbated by drought. The Government of Cameroon hopes the Lom Pangar Dam will increase these dams’ ability to generate power during dry periods by an estimated 105 MW to 216 MW.2 This increased electricity would assist the southern Cameroon grid’s capacity, where the Alucam aluminum smelter is seeking to double its production.3 The dam, proposed for one of the Sanaga’s most important tributaries, could significantly alter the river ecosystem, as well as submerge one of Africa’s most biodiverse hardwood forests (see section 6). The cumulative ecological impacts of adding yet another dam to this river system are unknown, but could be great.
The World Bank’s 2003 Country Assistance Strategy (CAS) for Cameroon states:
Hydropower already accounts for 95% of Cameroon’s electricity supply,virtually all of which is generated on the Sanaga River.8 In addition to Lom Pangar, the government has stated its intentions to build another dam on the Sanaga River, the Nachtigal Dam (266MW), further increasing the nation’s dependence on this river basin. This heavy dependence on hydro (and one river system) puts Cameroon at great risk for economic disruptions caused by droughts. In 2002, low rainfall resulted in blackouts during the dry season that drove up unemployment and business costs. Electricity generation has been further hampered by reservoir sedimentation and poor maintenance of the dams. But the government appears set on further exploiting hydropower rather than diversifying its energy resources (see section 9). Cameroon’s President has reportedly signed a financial agreement with the China International Water and Electrical Corporation (CWE) to assist in building three hydropower dams in Cameroon.9 It is unclear how effective the Lom Pangar Dam would be in regulating the river for better power generation in the face of ongoing droughts and unpredictable climate change. The World Bank has expressed concerns to the government of Cameroon about its energy mix, stating:
The 2003 CAS also states:
2. Project Origins In July 2001, the US–based AES Corporation and the government of Cameroonsigned a concession agreement for the World Bank/IFC–advised privatization of Sonel, Cameroon’s state–owned electric utility. As part of the 20–yearcontract, AES agreed to develop the Lom Pangar Dam within seven years if it were found to be the least cost option.12 Since privatization, electricity rates for residential consumers have increased by more than 10%. Price hikes led to street protests during massive blackouts in 2002. The World Bank has since expressed concerns about the privatization of Cameroon’s electricity sector. A February 2004 Bank report states:
3. Current Status Multiple feasibility studies for Lom Pangar were conducted in the 1990s, and, according to IUCN, an updated analysis was completed by the French Development Agency (AFD) in 2000.14 A new environmental impact assessment (EIA), led by the French company ISL, is expected to be completed in mid–2005. A three–member Independent Panel of Experts, facilitated by IUCN, has been established to review the EIA for compliance with international standards on the project’s social and environmental impacts. If the project is approved and financing obtained on the basis of these assessments, construction could begin soon and be completed as early as 2008. 4. Benefiting Big Aluminum Aluminum smelting is an energy–intensive industry that often seeks below–cost energy contracts. AES–Sonel’s largest customer is the Alucam aluminum smelter, owned by the Canadian company Alcan. Alucam currently consumes nearly half of the energy sold by AES–Sonel. Interested in doubling its aluminum production, Alucam is seeking up to 200 megawatts of additional electricity in order to expand its operation, at rates far lower than commercial and residential rates.15 Before the privatization of Sonel, Alucam was paying below cost for its electricity, and just one–tenth the rate charged to residential (“low voltage”) consumers.16 Local activists have spoken of the "disheartening equity concerns" over the government’s favoritism toward Alucam. About 95% of Cameroonians do not have access to electricity.17 If Alucam expands operations as planned, small businesses and residential users would see little benefit from Lom Pangar. The World Bank has concerns about Alucam’s energy use, and talked to Cameroon authorities about:
5. Dam–Affected People The large reservoir necessary for this project will dislocate a number of villages, requiring resettlement in the outer regions of Pangar. In January 2004, traditional chiefs of local villages met with state authorities and were told their communities would be displaced and resettled.19 There is great concern, however, about the implementation of these measures. Complaints from locals are being compiled for review. Many of these villagers, already impacted by the Chad–Cameroon Pipeline, are wary of Lom Pangar. In 2004, locals told the Independent Expert Panel that they needed more information about the project, especially about its benefits and environmental risks.20 The Expert Panel’s initial report (April 2004) details the history of dam projects in Cameroon, specifically noting the lack of energy benefits and job opportunities materializing for affected communities, while increased health risks have strained over–burdened local health care systems. Since other dam projects in Cameroon have brought large numbers of migrants and commercial fishermen to their reservoirs, local populations are also concerned about the influx of new people to the Lom Pangar region, leading to increased demands on local resources such as hunting and fishing grounds. 6. Drowning the Deng Deng Forest The Lom Pangar reservoir would submerge areas protected as mitigation for environmental impacts of the World Bank–sponsored Chad–Cameroon Pipeline, including parts of the Deng Deng Forest. The Deng Deng Forest (part of the greater Guinea Forest) not only has one of the highest levels of biodiversity in Africa, it is also one of the last remaining hardwood forests on the continent. For these reasons, great attention was given to protecting the forest from direct and indirect impacts of the pipeline. Yet the ecological value of the Deng Deng Forest has not been included in the cost–benefit analyses for Lom Pangar. Cameroon has already experienced massive deforestation due to logging for export (primarily to Europe and Asia). Almost half of Cameroon’s historic forest area has been cleared for agriculture and settlements.21 The government of Cameroon is reportedly very interested in logging the high–priced tropical hardwoods found in the Deng Deng. Anonymous sources report that concession agreements to log the forest have already been signed, and logging roads into the area are rumored to already be built. Additional access roads that would be built for dam construction could lead to increases in illegal logging and corruption in the region, already a widespread problem in Cameroon. Due to controversy surrounding the pipeline, the World Bank assembled an International Advisory Group (IAG) to oversee the implementation of the project. IAG reports have consistently noted the risks of the Lom Pangar Dam. Following are some relevant excerpts:
Destroying these protected areas will result in a serious violation of trust for all those involved in ensuring that environmental safeguards were respected for the Chad–Cameroon Pipeline. The World Bank’s reputation will suffer a serious blow should the project go forward unimpeded by previous World Bank agreements to protect the Deng Deng. 7. Uprooting the Chad–Cameroon Pipeline The construction of Lom Pangar, as designed, would not only result in the destruction of the forest that the pipeline project team sought to preserve, but the dam’s reservoir would submerge the land under which 20 km of the pipeline crosses. Because it was not built to withstand the extra pressure of the reservoir, the pipeline would have to undergo a costly excavation and either be rerouted or reinforced, resulting in a stop in oil flow for a period of time, with associated costs, as well as unknown environmental and social risks, such as additional damage to land and spills. After formal complaints about the World Bank’s Pipeline project were received, the independent Inspection Panel noted in its investigation report that the Lom Pangar Dam would:
Project sponsors have already spent a good deal of money ($18 million by some accounts) re–routing the pipeline to avoid the Deng–Deng Forest. It is currently unknown how much money it will cost to reroute the pipeline or reinforce it to withstand a reservoir, but clearly these costs would be substantial, and could conceivably be put to better use, such as supporting poverty reduction projects in local villages or improving protections for Cameroon’s remaining biodiversity hotspots. Project insiders believe that re–routing the pipeline for the dam could lead to a confrontation between project sponsors and the Cameroon government over who should shoulder the added costs, as well as over the legality of flooding the protected forest areas. 8. The Way Forward After a global review of large dam projects, the World Commission on Dams (WCD) released its final report in 2000, which set forth recommendations for a transparent, multi–stakeholder process to objectively assess a nation’s water and energy needs and choose appropriate options.26 The WCD’s recommendations, if followed, would help ensure that a particular large dam project has been found to be the most effective solution while guaranteeing that affected communities share project benefits without disproportionately bearing the project’s risks. To follow WCD recommendations, a project must start with a needs assessment rather than starting with a proposed solution to an undefined problem. A needs assessment is followed by an options assessment that engages all stakeholders and utilizes a transparent decision–making process. The Cameroon government is attempting to show compliance with WCD recommendations by utilizing an Independent Expert Panel to review the project’s EIA. The Expert Panel is charged with ensuring that Lom Pangar complies with international standards for social and environmental impact mitigation, including the WCD and World Bank safeguard policies,27 and will assist with public consultations and mediation should environmental disputes arise. The panel was originally contracted for one year (until December 2004, though work is continuing) and is being facilitated by the IUCN. While an admirable effort, the Expert Panel will only assess the environmental review, not the project in its entirety. The Panel’s mandate leaves out vital parts of the WCD recommendations, and will likely result in a weak approach to assessing the project, and broader national energy planning processes, without significant comparison against the WCD. 9. Project Alternatives While the EIA is expected to include a limited analysis of project alternatives (though not necessarily ones that have been fully evaluated to the extent that Lom Pangar has been), comprehensive needs or options assessments for Cameroon’s energy sector have not been made public. While the need for more reliable electricity is clear, the public has not been involved in the energy planning process thus far. The construction of Lom Pangar Dam will happen without the benefit of a comprehensive and participatory options assessment. Cameroon has great potential for saving energy through demand–side management and efficiency measures. Over 30% of the electricity generated in Cameroon is lost during transmission.28 Improving the efficiency of transmission lines could go a long way to lowering Cameroon’s need for additional power. AES–Sonel also notes that most power stations have been neglected and need sizable repairs.29 It is not clear that demand–side options are being fully considered prior to new supply projects such as Lom Pangar or thermal power plants. Cameroon also has a large reserve of natural gas. The World Bank states:
AES–Sonel is currently undertaking development of natural gas and oil power stations to help diversify Cameroon’s energy resources, but progress has been slow. AES–Sonel is also currently contracted with the Institute of Geological and Mining Research for renewable energy research, but the contract is only for one year and renewable energy development and decentralized, rural electrification do not appear to be priorities.31 10. Conclusions Insiders have said that the Cameroon Government has every intention of building the Lom Pangar Dam and that completing the EIA and using the Expert Panel are simply necessary steps to appease international donors. However, the dam is not being assessed against other energy alternatives in a comprehensive needs and options assessment. Nor is the process being made transparent or open for public participation. Transparency has been named a goal by the government, but needs to be demonstrated by real engagement of affected communities in the project process, and release of the AES–Sonel concession agreement and Lom Pangar studies. The World Bank, too, must take a public stand on this project and its impacts on protected forests offset for the Chad–Cameroon Pipeline. As one former project staffer said, “This project poses huge risks for the Bank’s reputation. We need to follow through on our promises. This is a moral issue.”